Ghadir direct reduction plant.

Installation project of lime system in ghadir direct reduction plan located in ardakan city Civil operation of the project.

Ghadir direct reduction plant.

Included:

Installation project of lime system in ghadir direct reduction plan located in ardakan city Civil operation of the project.
Installation of 100 tons of steel structure.
Installation of 50tons of fixed and rotary mechanical equipment.
Piping operation.
Electrical and instrumentation operations.

Project start date: 05/15/1392
Project end date: 04/09/1392